Network Working Group J. Bouknight Request for Comments: 156 26 April 1971 Category: G.5 Illinois Obsoletes: None Updates: None Status of the Illinois Site (Response to RFC 0116) As of the date of the report, 26 April, the Illinois Site has complete operational hardware connecting the PDP-11 system with the IMP. Due to much trouble with the Burroughs B6500 computer, final checkout of the operating system plus the network control program for the PDP-11 has been seriously curtailed. Current expectations are: --checkout of the NCP by the latter part of May --installation of the PDP-11 system in Paoli, PA (the operating link between Illinois and Burroughs in Paoli) so that the system will be operational during June [ This RFC was put into machine readable form for entry ] [ into the online RFC archives by Tom McGhan 7/97 ] [Page 1] gemini://gemini.bortzmeyer.org/rfc-mirror/rfc156.txt

-- Leo's gemini proxy

-- Connecting to gemini.bortzmeyer.org:1965...

-- Connected

-- Sending request

-- Meta line: 20 text/plain

-- Response ended

-- Page fetched on Mon May 6 20:44:49 2024